Case Study – Food & Beverage Sector
Back to Case StudiesPhased project and on-going machinery, process equipment relocations and capital plant installation project
RRS Group has significant experience in the food and beverage process and manufacturing sector
- One of Europe’s leading processors and suppliers of fresh produce chose RRS Group as their partner for a project of phased capex investment and equipment changes over an 18-month period.
- An extension to the main processing plant meant offloading significant amounts of new plant such as weighing, bagging, filling equipment and conveying machinery.
- Removal of redundant plant and equipment from existing areas, some for scrap, some into storage and some relocated and reinstalled into other parts of the process facility.
- Further new capital equipment offloaded, installed and positioned into the vacated areas.
- The equipment which was stored was stored in RRS Group’s own machinery storage facility and then uplifted and transported into the new area by RRS as the final phase of the project.
- The next phase now begins and RRS Group is already on-site installing and relocating older machinery to other areas.
- The entire machinery relocation, installation, transport, offload, positioning and alignment, electrical disconnections, and project management (including H & S) was carried out by RRS Group.